Packer Service LLC
ruen
  • About us
  • Safety
  • Services
  • Vacancies
  • Newsroom
  • Frac services
  • Coiled tubing
  • Well completion
ruen
Services / Slickline service

Slickline service

Operations with slickline are carried out by equipment and tool in operating wells and during workover operations.

Maintenance of dual injection assemblies by means of slickline equipment

  1. Installation and replacement of chokes.
  2. Installation of pressure gauges into mandrel.
  3. Wiper trip of tubing lift.

Slickline trucks of «Packer Service, LLC» are equipped both with wire and cable, that allows to work with the big loadings.

Services

Frac services
  • Blender for hydraulic fracturing
  • Heating installation
  • Installation of automated feeding chemicals for hydraulic fracturing
  • Manifold high and low pressure hydraulic fracturing model «CT-CM-160» on the chassis of Mercedes Benz 3332 K
  • Mercedes Benz Actros 3332, 6×6, model F-DACU-T-6
  • Pump system for hydraulic fracturing
  • Transport for sand for hydraulic fracturing
Coiled tubing
  • Coiled Tubing unit
  • Pump unit
Well completion
Packers service
Nitrogen well treatment
  • Nitrogen membrane unit
  • Nitrogen cryogenic unit
Dual completion services
  • Services at the organization of dual completion
Filtration assemblies services
Slickline service
Pressure transient analysis, well logging
  • Geological-technical study of drilling
Fishing service
Killing of well service
Squeeze jobs service
Supervising
Contact us

Head Office

Office 27, 1 bld. 6, Varshavskoe highway, Moscow, Russia, 117105

Tel/Fax

+7 (495) 663-3107

E-mail

info@packer-service.ru
  • Services
  • Frac services
  • Coiled tubing
  • Well completion
  • Main Page
  • Safety
  • Vacancies
  • Newsroom
  • Our projects
  • About us
  • Contacts
Packer Service LLC logo
Packer Service LLC,
© 2006-2022

Helpline

+7 (916) 684-5501

Health and safety hotline

+7 (915) 256-0668