Coiled tubing service
  
 Coiled tubing unit
 Pump unit
  
 
 
Nitrogen well treatment
  
 Nitrogen membrane unit
 Nitrogen cryogenic unit
  
 
Frac service with own frac fleets
 
Packers providing service
  
 Fracturing treatment technology
 Advantage of usage «Packer Service, LLC» packers
 New packers assembly
 Certificates, permissions
  
 
Dual injection operation services
  
 features of downhole equipment
  
 
Services with filtration system installation
 
Slickline service
 
Well flow test and downhole logging services
  
 geological-technical study
  
 
Fishing service
 
Killing of well service
 
Squeeze jobs services
 
Supervising

 
info@packer-service.ru
 Tel / Fax: +7 (495) 269-4922
 

Packers service

The technology of performing fracturing jobs without pooling packer out for maintenance allows following:

  • To Reduce term of putting of well on production from drilling from 28-30 days (with tree layers field development) till 12-17 days (depending on quality of performed frac job (presence of screenout in tubing and, accordingly, number of coiled tubing runs)
  • To Increase responsibility of frac performed contractors for qualitative carrying out of frac job, i.e. performance of good design of frac operation and absence of not displaced send in tubing (as a rule, RCP, the most expensive in frac job);
  • To Reduce requirements for coiled tubing equipmnet twice, and accordingly, reduce expenses for them;

Ease of packers unsetting has allowed customer to refuse from expensive workover rigs "IRA" with capacity of 100 tons (at average depth of well of 3100 m and a max. angles of deviation up to 65 degrees) that also has led to considerable decrease in expenses.

Patent of RF on invention is received on given technology.

Многоэтапный гидравлический разрыв пласта, Технология проведения ГРП без подъема пакера на ревизию