The service of preparing and pumping of killing solutions into the wells with abnormally high formation pressure is 5 years old
Own mobile mud unit is located on the service base of the Priobskoe fieldof OOO "Gazpromneft-Khantos", the unit is completed with a tank poolfor settling out and storing of finished mud and with a site for storing dry chemicals.
5 December 2011
News
Packer Service LLC has been providing well killing services since December 2006.
Our company provides the following services:
- calculation of fluid density required for well killing;
- preparation of well killing fluids with specific weight of 1.3—2.1 g/sm3 and engineering support of the process of killing;
- preparation of viscous packs for large fluid losses in the wells with abnormally high and abnormally low reservoir pressure;
- selection and reuse of heavy weight killing mud, utilization of linear gels and viscous packs;
- carrying out of the works of mild well killing;
The mud prepared by Packer Service LLC is characterized by high coefficient of formation damage recovery, low freezing temperature freezing and corrosiveness.